Sargent

The Sargent Field is operated by DGE I and flows in a single flowline system tied back to Genesis’ GB 72 platform.  Production commenced in March 2010.

Key Facts:

  • Area: Garden Banks Block 339
  • Operator: Deep Gulf Energy LP
  • Water Depth: 1217′
  • Working Interest: 25.00% (DGE I) 25.00% (DGE II)