The Odd Job Field was initially discovered by Eni with a well in MC 214. DGE II subsequently took over operatorship and drilled a well in MC 215 that discovered a second larger Miocene reservoir that proved the commerciality of the Odd Job field.
Odd Job will be developed with 2-3 subsea wells tied back to the Delta House FPS. The first phase of the development will begin producing in late 2016 from a single well on MC 215. Additional wells will be added as capacity becomes available on Delta House.
- Location: Mississippi Canyon 214 & 215
- Operator: DGE II
- Water Depth: 5996′
- Working Interests: 29.8750% (DGE II) 25.0000% (DGE III)

