Sargent

The Sargent Field is operated by DGE II and flows in a single flowline system tied back to Genesis’ GB 72 platform.  Production commenced in March 2010.

Key Facts:

  • Area: Garden Banks Block 339
  • Operator: Deep Gulf Energy II
  • Water Depth: 1217′
  • Working Interests: 25% (DGE I) 25% (DGE II)

 

Gallery_Images_0000_vlcsnap-89451
Gallery_Images_0001_vlcsnap-60139
Gallery_Images_0002_IMG_4442
Gallery_Images_0003_IMG_4438
Gallery_Images_0004_IMG_0909
Gallery_Images_0005_CIMG2030
Gallery_Images_0006_CIMG2002