Marmalard Project

The Marmalard Field was discovered in 2012 by a well that was operated by LLOG.  To date, four wells have been successfully drilled and completed in multiple middle Miocene pay sands. The wells are tied into a subsea manifold located in MC 300 which is tied back to the Delta House FPS with dual flow lines.  The field began producing in 2Q 2015.

Key Facts:

  • Location: Portions of Mississippi Canyon 255, 256, 300, 301 and 344
  • Operator: LLOG Exploration
  • Water Depth: 5746′ – 6131′
  • Current Wells: 4
  • Working Interest: 11.82311% (DGE II)